The PEMB and podium structuresĪre considered structurally independent structures and separated with an expansion joint above grade. The building structure is composed of the central steel portalįrame Pre-Engineered Metal Building (PEMB) and the surrounding 1- to 2-story podium structure that isįramed out of steel columns, steel beams, and composite metal deck slabs. The purpose of this contract is to remove the existing buildings and trailers located at Edison Jets Field (370Ĭentral Avenue) and to construct the new Edison Township Sports Building, inclusive of the associated,Īrchitectural, Structural, M.E.P., and Site Work. Replacement of Water Meters and Testing of Existing Meters New Construction, Demolition - 140,798 SFĪddition, Demolition, Infrastructure - 76,468 SF Improvements to Cottrell Road and County Drainage Structures New Construction, Infrastructure - 42,250 SFĪddition, Demolition, Renovation, Infrastructure - 6,413 SFĭemolition, New Construction, Infrastructure - 5,603 SFĬourtyard Project at Lawrence Brook Elementary School Central Avenue Multi-Residential Developmentĭemolition, New Construction, Infrastructure
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |